Jackson to Moomba Oil Pipeline
Due to increased oil production from the Jackson/Tarbat areas of SW Queensland a new pipeline is required from Jackson to Moomba. The pipeline will be 273km of 200mm steel, the entire lenght of this pipeline will be buried, except for the risers, main line valves (MLV) and scraper stations. The contract covers the construction of the pipeline together with all MLVs, tie-in points, and a mid line pigging station. A fibre optic cable will also be laid in the pipeline trench.
Services to client:
- Construction and Installation of 273km x 200mm oil pipeline with risers, main line valves, scraper stations and laying of fibre optic cable
|