

|
Diversified Engineering have recently been involved in a range of projects, including pipeline work in the Cooper basin and pipe spooling for the Burrup Fertilizer plant, the Dampier Port Upgrade and the Fosterville Gold Project. |
|
Client: Diversified Construction/Santos Location: Cooper Basin QLD Completed in June 2004 a 16KM x 200nb pipeline. |
|
Client: CBI Constructors Location: Diversified Jandakot Workshop From June to Sept 2004 Diversified are involved in pipe spooling work for the Burrup fertilizer plant. Low temperature carbon steel pipe work, Fabricated to ANSI B31:3 |
|
Client: Diversified Construction/Santos Location: Psyche to Baryulah, Cooper Basin QLD Completed in October 2004, 21km of 12” gas pipeline
|
|
Karmona to Ballera Pipeline |
|
Pipe Spooling for the Burrup Fertilizer Plant |
|
Psyche Pipeline |
|
Recent Projects |
|
HPS |
|
Client: Kerman Contracting Location: Diversified Jandakot Workshop From October 2004 to March 2005 Diversified Engineering were involved in carbon steel and stainless steel pipe spooling for the Fosterville Gold Project. |
|
Fosterville Gold Project |
|
Client: HPS Technology Location: Diversified Jandakot Workshop Heavy wall carbon steel and small bore stainless steel pipe spooling for Apache Energy for the Varanus Island Project.
|

