top of page

Custom Tailing Storage Facility Pump Control Panel

Tailings Storage Facility Pump Control Panel

A client approached us to develop and deliver a custom pump control panel to pump water in the tailing dams at the Gruyere pump station. ​ They required our team to design and build an appropriate custom solution to the tailings dam water pump to facilitate a plug-and-play design to reduce site installation costs. The project's scope includes the development of design drawings and the supply of field instrumentation and control panels. ​ Additionally, our team was needed on-site to gather information and specific requirements for the job and to implement the custom design.

Client

Talison Lithium

Location

Bibra Lake and Gruyere Mine, WA

Year

2021

Project Gallery

© 2022 by Divergent Engineering Pty Ltd. Proudly created with Wix.com.

bottom of page