Tailings Storage Facility Pump Control Panel

Client

Talison Lithium

Year

2021

Location

Bibra Lake and Gruyere Mine, Western Australia

Share

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram

A client approached us to develop and deliver a custom pump control panel to pump water in the tailing dams at the Gruyere pump station.

They required our team to design and build an appropriate custom solution to the tailings dam water pump to facilitate a plug-and-play design to reduce site installation costs. The project's scope includes the development of design drawings and the supply of field instrumentation and control panels.

Additionally, our team was needed on-site to gather information and specific requirements for the job and to implement the custom design.