Tailing Water Systems Upgrade

Divergent Engineering was by Axis Consulting to design and engineer Newmont Boddington Gold’s high wall pump project.​

The NBG pump project includes two phases as follows:​

Stage 1 Phase 1 – Running two pumps with a stand-alone system.

Stage 2 Phase 2 – Running four pumps with Power Grid.

​The project included the following Engineering studies:​

  • Compliance with the Mine Safety and Inspection Regulations (MSIR)
  • Power system modelling with ETAP software
  • Load flow analysis
  • Motor starting characteristic study
  • Protection design, settings and coordination
  • Cable design
  • Short-circuit analysis​
  • Arc Flash analysis

Client: Axis Consulting
Location: Divergent Engineering, West Perth
Year: 2021