Transformer Testing

Divergent Engineering were engaged by Gold Fields to perform maintenance and testing of site transformers at the Gruyere JV Mine.

Other assets covered includes:

  • Inspection of borefield powerlines and switchgear
  • Inspection of borefield pump distribution boards
  • Inspection of RMUs
  • Visual inspection of Switchroom assets such as switchgear, variable speed drives, communications, and control systems
  • Inspection of the camp generation system

Client: Gold Fields
Location: Gruyere Mine, Western Australia
Year: 2021